Product Detail :
|
Blasting, zinc metalizing and painting of 60kg rails and lifting, loading/unloading of rails ~ of 20rp to feed in for metalizing area and stacking area using railway gantry and hoists through conveyor /wagons as directed by engineer in charge with contractor's own labour, tools and plants in the railway premises of flash butt welding plant, s.e.railway.
|