Product Detail :
|
Raising of embankment height for as pond c at itps. Ash utilization in reclamation of low land inside plant at ipts. Expression of interest for utilization / off taking of ash from opgc. Arc flash study and training at itps. Overhauling of main oil pump, servicing of hpt & ipt stop & control valves and hrh strainers, inspection & replacement of generator hydrogen seals. Aoh of boiler pr. Parts, boiler & turbine valves, fuel fining system of unit 2. Upgradation of chiller unit (75tr) with installation, commissioning and testing. Repair of boiler tube leakage at ipts for the fy-2020-21. Repair of boiler tube leakage at ipts for the fy 2020-21. Coal co-ordination services. Annual maintenance contract for cleaning and hk activities (new infra). WTP regeneration area painting contract. Monsoon preparedness – storm water drainage and for traffic movement. Supply of toc analyser & other lab equipment.
|