Product Detail :
|
Raising of embankment height for ash pond ācā at itps. ash utilization in reclamation of low land inside plant at itps. expression of interest for utilization/off-taking of ash from opgc. arc flash study and training at itps. overhauling of main oil pump, servicing of hpt&ipt stop & control valves and hrh strainers, inspection & replacement of generator hydrogen seals. aoh of boiler pr. parts, boiler & turbine valves, fuel firing system of unit 2. upgradation of chiller unit (75tr) with installation, commissioning & testing. repair of boiler tube leakage at itps for the fy- 2020-21.
|