Product Detail :
|
Execution of earthwork in formation in embankment/ cutting, p. way linking, ballast supply and allied works between soro (ex.) (km 265.500) to sabira (in) (km 274.100) including sabira yard in connection with the construction of 3rd line between narayangarh-bhadrak of s. e. railway.
|