Product Detail :
|
Raising of embankment height for ash pond at tilia (unit 3 & 4) epc contract for basic engineering study, calculation and modification of existing ash handling plant for capacity augmentation of opgc 2 x 660 mw annual maintenance contract for hvac system of opgcii arc for rubber lining of various tanks at opgc-ii field operation service contract of opgc-ii annual overhauling of power transformers during aoh of unit 2 overhauling of 20 mva 220kv/33kvcolony transformer overhauling and repair of uat 2a (16 mva,15.75/6.5 kv ,telk make) operation and sampling works of wtp at itps, opgc-i & ii purchase of fly ash & pond ash from itps.
|